Mechanical, electrical and plumbing estimates for contractors.

Send us the drawing set. We send back a priced takeoff you can bid from — quantities, unit rates, labor hours, line by line.

Sample work

This is what arrives.

A fragment of a ductwork takeoff. Every line carries its own quantity, wastage allowance, unit, labor hours and material rate — so you can price it your way, or check ours. Yellow cells are yours to change.

Ductwork takeoff — Division 23 Commercial · new construction · TX
Sr. Description Qty Waste Qty + waste Unit Unit lab hrs Unit mat $ Unit lab $ Total hrs
Flexible air duct
16" dia flexible air duct, insulated3.6010%3.96LFT0.0853.755.950.34
28" dia flexible air duct, insulated71.9210%79.11LFT0.1005.867.007.91
310" dia flexible air duct, insulated918.5810%1,010.44LFT0.1209.948.40121.25
412" dia flexible air duct, insulated24.6410%27.10LFT0.14513.3010.153.93
Flexible connections
110" dia flexible connection22EA0.32075.0022.400.64
220"×12" flexible connection157157EA0.840199.0058.80131.88
324"×20" flexible connection1919EA0.900212.0063.0017.10
432"×20" flexible connection66EA1.385329.0096.978.31
548"×24" flexible connection66EA1.962466.00137.3511.77
Sheet subtotal — labor hours303.13

Sheets are grouped by system, then rolled into a recap that separates material, labor, sales tax, overhead and profit — so the number you bid is one you can defend in a scope review. Project details on all samples are removed.

Scope

MEP is the specialty. Not the limit.

Divisions 21, 22, 23 and 26 are what our estimators price every week — deep enough that we catch the things a generalist misses in a scope review.

Everything else in the set is still on the table. Full GC packages, single trades, whatever's in the drawings.

Div 21
Fire protection
Sprinkler and standpipe systems, heads, valves, pipe and fittings.
Div 22
Plumbing
Domestic water, sanitary and vent, storm, gas, fixtures and equipment.
Div 23
HVAC
Ductwork takeoff, air devices, rooftop and packaged units, piping, controls.
Div 26
Electrical
Feeders and branch circuits, gear, lighting, devices, fire alarm and low voltage.

Also estimated

Div 03 Concrete · Div 04 Masonry · Div 05 Structural steel · Div 06 Wood and plastics · Div 07 Thermal and moisture · Div 08 Openings · Div 09 Finishes · Div 10 Specialties · Div 27 Communications · Div 28 Electronic safety

Full GC packages by arrangement. Site work excluded.

We work in

PlanSwift · AccuBid · Conest · Vision InfoSoft · Bluebeam

Turnaround

2–3 business days. Rush 24–48 hours available.

About

About StatLab

StatLab is a construction estimating firm serving contractors across the United States. We produce quantity takeoffs and cost estimates for commercial and residential projects — offices, schools, healthcare, retail, industrial and multifamily.

Our estimators work from your drawings and specifications to deliver bid-ready numbers you can stand behind in a scope review.

Have a set you need priced?

Send it over. We'll scope it and come back with a fixed fee before anything is owed.