StatLab

Free scoped quote

Send the set. We'll come back with a fixed fee.

No hourly rates, no estimate on the estimate. We look at the drawings, tell you what it costs, and nothing is owed until you say go.

How pricing works

One fee, agreed up front.

Estimating fees depend on scope, drawing count and how much of the set is actually developed — so we price each job after we've seen it, not from a rate card that would be wrong either way.

01
You send the drawings
Plans, specs, addenda, whatever you have. PDF, DWG or a zip. Tell us which divisions you're chasing and when the bid is due.
02
We scope it and quote
An estimator reads the set and comes back with a fixed fee broken out by division, plus what's included and what isn't. Costs you nothing.
03
You decide
Accept and we start. Adjust the scope and we'll requote. Walk away and you've lost nothing but the upload.
04
You get the takeoff
Priced BOQ, assumptions and exclusions, in a working file you can edit. Two to three business days as standard, 24–48 hours on rush.

Confidentiality

Your drawings stay yours.

We use them to price your job and nothing else. Not shared outside the estimators working on it, never used as sample or marketing material, and deleted whenever you ask. That is how we operate on every set that comes in — you don't have to request it.

Need it on your own paper? Send your NDA over and we'll sign it.

Before you send

What makes a quote fast.

The more of the set we have, the tighter the fee — and the fewer assumptions end up on your exclusions sheet.

Most useful: the drawing index, the division you're bidding, the specification section, and the bid due date. Nice to have: addenda, RFI responses, and any scope letter you've already had from the GC.

Partial set is fine. We'd rather tell you what's missing than guess.

Ready when you are.

Upload takes a minute. The quote comes back the same day on most single-trade jobs.