DIV 31–32EARTHWORK · GRADING · PAVING · SITE IMPROVEMENTS
Sitework takeoffs & estimates, down to the last cut.
Cut and fill, grading, paving and site concrete, measured from your civil set and priced line by line. Built for site contractors and GCs carrying the site package.
C-301 · GRADING PLAN1" = 40'
QUOTE WINDOW 02:00:00DIV 31–32 TAKEOFF · LIVE
Cut8,640 CY
Fill6,210 CY
Asphalt paving, 3"4,180 SY
Curb & gutter1,960 LF
99%MTO ACCURACY
72hSTANDARD · BUSINESS HOURS
2 hrsFREE QUOTE · BUSINESS HOURS
1SITEWORK SAMPLE TO REVIEW
01 · SCOPE
What we take off
Existing and proposed surfaces are compared to get true cut and fill, with shrink and swell applied, so your haul numbers are real.
EarthworkCut, fill, import and export by volume from existing and proposed grades, with shrink and swell shown.
Clearing & demolitionClearing and grubbing and topsoil stripping, plus removal of existing paving and structures.
PavingAsphalt and concrete paving by section, with base course and subgrade prep.
Site concrete & curbsCurb and gutter, sidewalks, ramps and pads by the linear or square foot.
Erosion controlSilt fence, inlet protection, construction entrances and stabilization per the SWPPP.
Landscape & site improvementsTopsoil, seed, sod and planting, plus fencing and pavement markings.
02 · DELIVERABLES
What you receive
Every job, every trade: an estimate you can edit, and the plans that prove it, delivered through your own project link with no passwords. Broken out by phase, area or alternate when the bid needs it.
.XLSX · FULLY EDITABLEExcel estimateEvery quantity, rate and price is open. Adjust margins, labor rates and material pricing to suit your bid. The totals recalculate.
.PDF · COLOR-CODEDMarked-up plansOur takeoff markups on your drawings. See exactly what was counted and measured, and check any line against the sheet.
SITEWORK WORK BUILT IN
PlanSwiftBluebeam RevuOn-Screen TakeoffRSMeansAutoCAD
03 · PROOF
Sitework samples
Grading & earthworkView sample →
04 · FIT
Who it's for
Site contractorsEarthwork contractorsPaving contractorsGeneral contractors
COMMERCIALINDUSTRIALMULTIFAMILYEDUCATIONMUNICIPALSUBDIVISIONS
05 · QUESTIONS
Sitework FAQ
How do you get cut and fill?
From existing and proposed contours or spot grades, built into surfaces and compared. If you have CAD or surface files, we use them.
Do you apply shrink and swell?
Yes, as factors you can see and change in the Excel file. We use your geotech report when there is one.
Is topsoil stripping separate?
Yes. Stripping and respreading are their own lines, so they don't hide inside the mass earthwork.
How fast can I get it?
Free quote within 2 business hours (Mon–Fri, 8 AM–5 PM CT). Delivery in 72 business hours, or 24 to 48 hours by arrangement with no surcharge.
YOUR FREE QUOTE WINDOWSend the civil set. Price back in 2 business hours.
02:00:00Quotes resume 8 AM CT
Start a quote →